|
 |
 |
|
 |
| |
| HUME BUILDINGĀ SOLUTIONS |
|
ADVANTAGES
- Rapid Construction
- Shorter construction time compare with conventional in-situ construction method.
- Less sensitive to weather conditions.
Cost Effective
- Time saving and minimal maintenance result in overall cost saving for the project.
Safe, clean site
- Minimum formwork and scaffolding required.
- Minimum noise and rubbish pollution to the surrounding environment.
- Clean, safe access for inspections reduce accident risks.
Quality
- Less dependent on unskilled foreign workers.
- Stringent control in factory ensure consistent and high quality components.
Environmental Friendly
- Marked reduction in use of timber.
|
| |
INNOVATIVE
SYSTEMS |
INNOVATIVE COMPONENTS |
Hume
Industrial Building System (IBS) |
Hume
Precast Car Park System |
Hume
Frame System |
Hume
Wall Panel System |
Hume Half Slab |
Long Span Flooring |
Prefabricated Staircase |
Customised Components |
|
| |
| |
| Deatils | Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 |
| |
|
| Top |
 |
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ) |
 |
|
|
|
|